中国人妻一区二区三区精品,国产精品一区乱码在线观看,亚洲理论在线a中文字幕,精品国产女主播在线观看

Your Position: Home > Support > Service Center

Notes for reuse of Lyboa pump of ZYD transformer oil filter

2019/8/1??????view:

  The pump must be stored in a dry place before it returns to the workplace again. Better at room temperature (200C). Before the pump is withdrawn from the workplace, it should be removed from the vacuum system, washed with dry nitrogen and replaced with oil. The inlet and outlet of the pump must be sealed with the shipping seals at the time of delivery. The gas town must be closed. If the pump is idle for a long time, it should be sealed with plastic bags and desiccant.

  If the pump has been idle for more than a year, it must be maintained in a standard way and oil must be changed before the pump is put into operation again. We recommend that you contact the LEYBOLD manufacturer for maintenance services.

  Standard pumps are not suitable for installation in explosive dangerous areas. Please contact us when you intend to apply this method. Before installing the pump, it must be reliably disconnected from the power supply in order to prevent accidental start-up of the pump. Pumps can only be installed by qualified and well trained personnel. All safety regulations should be observed.

  Installation of ZYD oil filter Lyboa pump for reuse:

  In order to ensure safe start-up, it is necessary to proceed step by step according to the following instructions.

  The start-up can only be carried out by trained full-time personnel.

  SOGEVAC can be installed on any flat, horizontal plane. Under the four legs, there are metric threaded holes for fixing pumps.

  If the pump is inclined, the oil level can not be correctly read out. The pump is in danger of running dry.

  According to the different use of oil, the ambient temperature of the pump should be between 12 (55) and 40 (104). By improving the pump or replacing different types of oil, the pump can operate at lower ambient temperature. Please consult us about these questions.

  In order to ensure a good cooling of the pump, there should be enough space in the intake and exhaust outlets for maintenance and repair. Make sure the motor air intake is clean and clean.

  1. Connect to the system

  Standard pumps are not suitable for installation in explosive dangerous areas. When you plan to do so, please consult us. Before installing the pump, it must be reliably cut off from the power supply to prevent unintentional starting of the pump. The pump can only be installed by qualified and trained professionals.

  Comply with all safety regulations.

  2. Inlet side

  The intake flange of the pump is connected by internal threads. The pump can be connected to the vacuum system with suitable connectors.

  The cross section of the intake pipe should be at least the same as that of the intake port. If the intake pipe diameter is too small, the pumping speed will be reduced.

  We recommend using LOCTITE or TEFLON tape for threaded joints to ensure vacuum sealing. (especially when dangerous gases)

  3. Installation Warning of ZYD Oil Filter Lyboa Pump

  The pump should be connected to the intake pipe without any stress. Hose or pipe fittings are used in intake and exhaust pipes for easy removal during pump maintenance.

  - The maximum import pressure shall not exceed atmospheric pressure (about 1013 mbar). When there is excessive pressure in the import, the pump shall not be started.

  - The type of material used in the installation of pipes should take into account the type of gas pumped. The same is true for seals.

  If the process gas contains dust, dust filters must be installed in addition to random dust filters. We recommend that dust filters be installed horizontally with tees (3/13) or elbows (3/14). This ensures that no dust particles fall into the intake when the filter is removed. Import filters with different filter elements. Metal filter can prevent solid particles such as paper and plastics from entering the pump; paper filter can remove small particles such as dust and powder less than 1 micron; activated carbon filter can absorb chemical vapor such as acid and solvent. If the activated carbon filter is stored in a humid place, it should be dried at 212 for 2 hours before use.

  When extracting steam, we recommend installing condensers at the inlet and outlet sides.

  When pumping dangerous gas, the intake pipe must be tight.

  Solid particles or liquids are never allowed to enter the pump.


亚洲国产精品国自产拍av| 一本精品中文字幕在线| 久久久久久青青无码日韩| 99久免费视频在线观看| 色欲av人妻精品一区二区直播| 亚洲精品中文字幕一二三| 国内精品久久久久久野外| 又粗又爽高潮午夜免费视频| 人成国产h视频在线观看| 精品久久久鲁鲁鲁久久久| 欧美精品久久久久久久蜜| 国产精品丝袜久久久久av| 日韩av网站在线免费观看| 91精品国产综合久久久久| 日本精品视频一视频高清| 国产精品一区二区av片| 熟女视频一区二区三区国产 | 一区二区三区日本在线视频| 日本大香蕉视频一区二区| 大香伊蕉欧美一区二区三区| 无码av一区二区免费看| 久久夜午夜精品视频免费| 亚洲精品无码一区二区| 97资源在线免费观看视频| 国产免费久久精品99久久| 伊人久久大综合| 国产99久久久久久久久久| 亚洲欧洲日本欧美另类的| 三级黄色片一区二区三区| 日韩欧美大码a在线观看| 99蜜桃在线观看免费视频网站| 在线观看免费日本一区二区| 欧美亚洲视频| 久久久一本精品| 蜜桃av一区二区三区电影| 吃奶水人妻精品一区二区| 久久99精品国产99久久6尤物| 怡春院一区二区欧美三区| 国产日韩欧美精品线路一区| 国产精品国产三级国产av | 日本一区二区三区免费看|